Tristate Midstream
  Home About Us Tristate Sabine Gallery Contact

Tristate Sabine

Tristate Sabine, LLC consists of approximately 35 miles of high pressure pipeline. This system provides gathering services from either wellheads or centralized CDPs, dehydration, treating, and redelivery to Gulf South Pipeline.

Current combined treating capacity of approximately 35mm/d, depending on CO2 content, is provided at our 150GPM Baker Road amine treating station. Redelivery capacity for this system is currently 40mmcf/d to Gulf South Pipeline. Future expansion that is underway includes a second 150GPM amine expansion at the Baker Road station which will double current treating capacity on the system and will be in service in July, 2010. Expansion of redelivery markets is currently underway, including an expansion of Gulf South redelivery capability to 80mm/d mid year, and a new interconnect into Tennessee Gas Pipeline for 150mm/d that will be available by year end. Future plans also include: expansion of pipeline footprint, 400GPM of added treating capacity at the Dyess Station, and the proposed Toledo Bend lake crossing, and further expansion of the Gulf South redelivery point to a full 100mm/d, which will result in total system redelivery capacity of 250mm/d.


 
   
   
 

Tristate Midstream LP 3311 N Interstate 35 Ste 120 Denton, Texas 76207 o:(940) 387-4955
designed by Netvida Marketing, Inc.